Discover Opportunities months before the RFP drops
Learn more โRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Culver City
Avenue High Friction Surface Treatment Improvements .
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs โ target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Riverside
Project consists of constructing a raised median, grind and overlay, and high friction surface treatment (HFST). The project also includes signing and striping improvements along the project segment. Additionally, the project includes the replacement of existing detector loops at the signalized intersection.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
City of Riverside
Close: Dec 4, 2025
Project consists of constructing a raised median, grind and overlay, and high friction surface treatment (HFST). The project also includes signing and striping improvements along the project segment. Additionally, the project includes the replacement of existing detector loops at the signalized intersection.
AvailableHibbing Housing And Redevelopment Authority
Roof Improvements Project.
Posted Date
Oct 18, 2025
Due Date
Nov 20, 2025
Release: Oct 18, 2025
Hibbing Housing And Redevelopment Authority
Close: Nov 20, 2025
Roof Improvements Project.
AvailableCity of Benton Harbor
Work includes the replacement of the sanitary sewers and sewer service laterals, water main and water service laterals, hot mix asphalt paving, curbs and gutters, sidewalk, as well as storm sewer and sidewalk ramp improvements with all associated traffic control for work.
Posted Date
Nov 1, 2025
Due Date
Nov 25, 2025
Release: Nov 1, 2025
City of Benton Harbor
Close: Nov 25, 2025
Work includes the replacement of the sanitary sewers and sewer service laterals, water main and water service laterals, hot mix asphalt paving, curbs and gutters, sidewalk, as well as storm sewer and sidewalk ramp improvements with all associated traffic control for work.
AvailableCity of Chickasha
A new 6.0 MGD (expandable in the future to 8.0 MGD) conventional water treatment facility, chemical storage and feed facilities, clearwell, transmission pump station and piping, pretreatment building improvements, and associated services.
Posted Date
Oct 30, 2025
Due Date
Dec 10, 2025
Release: Oct 30, 2025
City of Chickasha
Close: Dec 10, 2025
A new 6.0 MGD (expandable in the future to 8.0 MGD) conventional water treatment facility, chemical storage and feed facilities, clearwell, transmission pump station and piping, pretreatment building improvements, and associated services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo โVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis