Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Alabama Department of Transportation
Work includes : 2,192 CY unclassified excavation; 35 CY structure excavation; 5,560 SY crushed aggregate base course, type b, road mixed, 6" compacted thickness; 5,560 SY bituminous treatment a; 5,411 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick); see attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lebanon
Work includes : intersection improvements including hma pavement removal, grading, backfill, concrete walks, ada ramps, concrete curbs, hma pavement milling and resurfacing, thermoplastic striping, seeding, and traffic maintenance, and other work as required.
Posted Date
Nov 4, 2025
Due Date
Nov 24, 2025
Release: Nov 4, 2025
City of Lebanon
Close: Nov 24, 2025
Work includes : intersection improvements including hma pavement removal, grading, backfill, concrete walks, ada ramps, concrete curbs, hma pavement milling and resurfacing, thermoplastic striping, seeding, and traffic maintenance, and other work as required.
AvailableAustin, City Of, Transportation and Public Works Department Project Delivery Division
The work consists of intersection safety improvements including construction of sidewalks, bike lanes, raised medians, curb and gutter, pavement widening, turn lane improvements, driveway reconstruction, bus stop improvements, pavement mill and overlay, traffic signal improvements, pavement markings, signage, drainage improvements, and utility adjustments. Also includes 20 LF of encasement pipe 16" dia., type steel, min. 3/8" thickness, ASTM A134; 1,645 LF of installing PVC traffic signal conduit with conduit 2" in dia., see attached files.
Posted Date
Oct 20, 2025
Due Date
Nov 20, 2025
Release: Oct 20, 2025
Austin, City Of, Transportation and Public Works Department Project Delivery Division
Close: Nov 20, 2025
The work consists of intersection safety improvements including construction of sidewalks, bike lanes, raised medians, curb and gutter, pavement widening, turn lane improvements, driveway reconstruction, bus stop improvements, pavement mill and overlay, traffic signal improvements, pavement markings, signage, drainage improvements, and utility adjustments. Also includes 20 LF of encasement pipe 16" dia., type steel, min. 3/8" thickness, ASTM A134; 1,645 LF of installing PVC traffic signal conduit with conduit 2" in dia., see attached files.
Alabama Department of Transportation
Work includes approx.110 LF of Removing Guardrail, 59 CUYD of Borrow Excavation (Loose Truckbed Measurement)(A4 or Better) , 168 LF of 22" Span, 14" Rise Roadway Pipe (Class 3 R.C.) ,4,022 SQFT of Temporary Traffic Control Markings .
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes approx.110 LF of Removing Guardrail, 59 CUYD of Borrow Excavation (Loose Truckbed Measurement)(A4 or Better) , 168 LF of 22" Span, 14" Rise Roadway Pipe (Class 3 R.C.) ,4,022 SQFT of Temporary Traffic Control Markings .
AvailableCity of Fort Worth
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Release: Oct 29, 2025
City of Fort Worth
Close: Dec 4, 2025
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis