Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of intersection safety improvements including construction of sidewalks, bike lanes, raised medians, curb and gutter, pavement widening, turn lane improvements, driveway reconstruction, bus stop improvements, pavement mill and overlay, traffic signal improvements, pavement markings, signage, drainage improvements, and utility adjustments. Also includes 20 LF of encasement pipe 16" dia., type steel, min. 3/8" thickness, ASTM A134; 1,645 LF of installing PVC traffic signal conduit with conduit 2" in dia., see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of labor, tools, materials, and equipment for the 7th and State St. Crosswalk Improvements Project.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Close: Dec 19, 2025
Procurement of labor, tools, materials, and equipment for the 7th and State St. Crosswalk Improvements Project.
Roadway, drainage, utility, and traffic signal improvements at the intersection in order to add a raised crosswalk.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Roadway, drainage, utility, and traffic signal improvements at the intersection in order to add a raised crosswalk.
AvailableIntersection improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Intersection improvements.
AvailableSealed public-works construction bid in Kirkland, WA for 7th and State St crosswalk improvements — scope includes right-of-way work, sidewalk and curb restoration, pavement repair, electrical work, traffic control, and installation of a complete RRFB (Rectangular Rapid Flashing Beacon) system; estimated bid range $100,000–$130,000. Requires Washington contractor registration, 5% bid bond, prevailing wage compliance, and submission of standard public-works bid forms.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Sealed public-works construction bid in Kirkland, WA for 7th and State St crosswalk improvements — scope includes right-of-way work, sidewalk and curb restoration, pavement repair, electrical work, traffic control, and installation of a complete RRFB (Rectangular Rapid Flashing Beacon) system; estimated bid range $100,000–$130,000. Requires Washington contractor registration, 5% bid bond, prevailing wage compliance, and submission of standard public-works bid forms.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis