Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Colorado Springs Utilities seeks a design-build contractor to deliver a guard shack at the Horizon Power Plant site in El Paso County, Colorado. Proposals are due on December 5, 2025.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking progressive design-build services for the treatment plant.
Posted Date
Sep 29, 2025
Due Date
Dec 22, 2025
Release: Sep 29, 2025
Close: Dec 22, 2025
Seeking progressive design-build services for the treatment plant.
AvailablePremium
Access the largest public sector contact database
Provide Design-build (DB), Replace Backup Power Generation.
Posted Date
Apr 23, 2025
Due Date
Jan 15, 2026
Release: Apr 23, 2025
Close: Jan 15, 2026
Provide Design-build (DB), Replace Backup Power Generation.
AvailableDESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
Posted Date
Nov 24, 2025
Due Date
Dec 30, 2025
Release: Nov 24, 2025
Close: Dec 30, 2025
DESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
AvailableDESIGN-BID-BUILD - construction of an approx. 17,135SF one story new chilled water district cooling plant (DCP). The DCP will be an unoccupied one-story building. The exterior facade is to be pre-cast panels. Construction option of a new parking area to replace existing parking that will be lost due to the boundaries of the new building.
Posted Date
Nov 18, 2025
Due Date
Jan 15, 2026
Release: Nov 18, 2025
Close: Jan 15, 2026
DESIGN-BID-BUILD - construction of an approx. 17,135SF one story new chilled water district cooling plant (DCP). The DCP will be an unoccupied one-story building. The exterior facade is to be pre-cast panels. Construction option of a new parking area to replace existing parking that will be lost due to the boundaries of the new building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium