Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx. 4500 SF interior painting project with 100% color change. Minimal patch and repair. Doorframes and moldings to be included.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide interior painting of the hallways, common areas and classrooms of the buildings. Scope of work will include painting of walls, wood and metal surfaces, handrails, exterior doors, door frames and storefronts, if applicable. Stained interior wooden doors will have to be sanded and refinished.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Provide interior painting of the hallways, common areas and classrooms of the buildings. Scope of work will include painting of walls, wood and metal surfaces, handrails, exterior doors, door frames and storefronts, if applicable. Stained interior wooden doors will have to be sanded and refinished.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the surface preparation and painting of a 1.0-million-gallon elevated storage tank’s interior and exterior. The tank to be painted is a toro-spherical steel bowl supported by steel legs. Additionally, the project includes the replacement of the cathodic protection system and other minor electrical work.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
Close: Jan 15, 2026
The project includes the surface preparation and painting of a 1.0-million-gallon elevated storage tank’s interior and exterior. The tank to be painted is a toro-spherical steel bowl supported by steel legs. Additionally, the project includes the replacement of the cathodic protection system and other minor electrical work.
AvailableThe City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
Posted Date
Dec 7, 2025
Due Date
Jan 27, 2026
Release: Dec 7, 2025
Close: Jan 27, 2026
The City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
AvailableThe University of South Carolina is soliciting bids to construct exterior soccer stadium lighting for the new soccer complex at USC Aiken. The scope includes poles, pole bases, fixtures, and controls and must meet NCAA standards. The project is located at 471 University Parkway, Aiken, SC, with an estimated construction cost between $584,000 and $649,000.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
The University of South Carolina is soliciting bids to construct exterior soccer stadium lighting for the new soccer complex at USC Aiken. The scope includes poles, pole bases, fixtures, and controls and must meet NCAA standards. The project is located at 471 University Parkway, Aiken, SC, with an estimated construction cost between $584,000 and $649,000.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →