Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the replacement of a fuel storage tank at the Honolulu Fire Department's Kahuku Fire Station.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide 1000 gallon replacement fuel storage tank and fuel dispenser, including demolition, limited hazardous material survey, equipment, installation, controls, and testing.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Provide 1000 gallon replacement fuel storage tank and fuel dispenser, including demolition, limited hazardous material survey, equipment, installation, controls, and testing.
AvailablePremium
Access the largest public sector contact database
Demolition of the existing fire station and constructing a standard 3-bay fire station. The fire station consists of: 2-engine, 3-bay fire station (R-2/B/S-2 occupancies), generator/pump building (F1 occupancy), storage building (S-2 occupancy), carport (u occupancy), trash enclosure, above ground fuel vault on-site improvements include grading, pavement, utilities, septic system, LPG tank, drainage, site curb/gutter/sidewalks, site lighting, site fencing, hose wash rack, hydrants, flagpole, facility sign, landscaping, and irrigation. Demolition work includes removal of existing structures, hose rack, tanks, poles, towers, signs, A/C, paving, concrete, sidewalks, curbs, trees and related utilities.
Posted Date
Dec 5, 2025
Due Date
Jan 14, 2026
Release: Dec 5, 2025
Close: Jan 14, 2026
Demolition of the existing fire station and constructing a standard 3-bay fire station. The fire station consists of: 2-engine, 3-bay fire station (R-2/B/S-2 occupancies), generator/pump building (F1 occupancy), storage building (S-2 occupancy), carport (u occupancy), trash enclosure, above ground fuel vault on-site improvements include grading, pavement, utilities, septic system, LPG tank, drainage, site curb/gutter/sidewalks, site lighting, site fencing, hose wash rack, hydrants, flagpole, facility sign, landscaping, and irrigation. Demolition work includes removal of existing structures, hose rack, tanks, poles, towers, signs, A/C, paving, concrete, sidewalks, curbs, trees and related utilities.
Posted Date
Dec 5, 2025
Due Date
Jan 14, 2026
Release: Dec 5, 2025
Close: Jan 14, 2026
Provide and install a new 1000-gallon above ground gasoline fuel storage tank, veeder-root system, and gasboy dispenser, as well as remove the current 1000-gallon tank.
Posted Date
Dec 16, 2025
Due Date
Jan 9, 2026
Release: Dec 16, 2025
Close: Jan 9, 2026
Provide and install a new 1000-gallon above ground gasoline fuel storage tank, veeder-root system, and gasboy dispenser, as well as remove the current 1000-gallon tank.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis
Demolition of the existing fire station and constructing a standard 3-bay fire station. The fire station consists of: 2-engine, 3-bay fire station (R-2/B/S-2 occupancies), generator/pump building (F1 occupancy), storage building (S-2 occupancy), carport (u occupancy), trash enclosure, above ground fuel vault on-site improvements include grading, pavement, utilities, septic system, LPG tank, drainage, site curb/gutter/sidewalks, site lighting, site fencing, hose wash rack, hydrants, flagpole, facility sign, landscaping, and irrigation. Demolition work includes removal of existing structures, hose rack, tanks, poles, towers, signs, A/C, paving, concrete, sidewalks, curbs, trees and related utilities.
Demolition of the existing fire station and constructing a standard 3-bay fire station. The fire station consists of: 2-engine, 3-bay fire station (R-2/B/S-2 occupancies), generator/pump building (F1 occupancy), storage building (S-2 occupancy), carport (u occupancy), trash enclosure, above ground fuel vault on-site improvements include grading, pavement, utilities, septic system, LPG tank, drainage, site curb/gutter/sidewalks, site lighting, site fencing, hose wash rack, hydrants, flagpole, facility sign, landscaping, and irrigation. Demolition work includes removal of existing structures, hose rack, tanks, poles, towers, signs, A/C, paving, concrete, sidewalks, curbs, trees and related utilities.