Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the mitigation of drainage issues via installation of 610 LF of 4" PVC drainpipe and ancillary items at several locations within the Subdivision.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of labor, materials, and equipment for the construction of drainage improvements, including 8-inch and 4-inch IPS HDPE force main pipe installation, lift stations, electrical work, grading, excavation, and erosion control.
Posted Date
Dec 30, 2025
Due Date
Feb 5, 2026
Release: Dec 30, 2025
Close: Feb 5, 2026
Procurement of labor, materials, and equipment for the construction of drainage improvements, including 8-inch and 4-inch IPS HDPE force main pipe installation, lift stations, electrical work, grading, excavation, and erosion control.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of 8" nominal dimension IPS HDPE force main pipe to be installed by horizontal directional drilling (HDD) and a 4" nominal dimension IPS HDPE force main pipe by open trench construction. Other site work includes lift stations, electrical work, grading, temporary shoring, excavation, installation of drainpipe and structures, concrete work, plantings, and erosion control.
Posted Date
Dec 30, 2025
Due Date
Feb 5, 2026
Release: Dec 30, 2025
Close: Feb 5, 2026
Project consists of 8" nominal dimension IPS HDPE force main pipe to be installed by horizontal directional drilling (HDD) and a 4" nominal dimension IPS HDPE force main pipe by open trench construction. Other site work includes lift stations, electrical work, grading, temporary shoring, excavation, installation of drainpipe and structures, concrete work, plantings, and erosion control.
AvailableWork consist of drainage improvements to the outfall and other miscellaneous work.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Work consist of drainage improvements to the outfall and other miscellaneous work.
AvailableRelease: Jan 21, 2026
Close: Jan 26, 2026
Miscellaneous Drainage Improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →