Summary
The work includes a new water system for the Upper Hoh Highlands which will initially serve the initial 14 home sites and the Resiliency Center, including the following: Connection to the existing treated water supply from the existing storage tank, install a 3-way actuator valve and extend piping, conduit and wiring for location of proposed water storage tank. The construction of a new pump house including domestic booster pumps and associated water pipe. Bid Alternates include the addition of one new water storage tank; a fire pump and diesel generator with their ancillary materials, appurtenances, and other details; process piping/valving to the existing water tank, site work and electrical controls. Alternate 1 - add phase A.2, alternate 2 - substitute: manufactured structure for CMU build pump house.