Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Dallas
Construction of the Hillcrest Road Pump Station House per the construction documents prepared by Jacobs Engineering. The bids are for construction of an enclosure around the existing pump station equipment to simulate the style of surrounding residential houses in the area. The construction will include the house as a base bid and ten alternates for site development items, security, and monitoring improvements to the facility.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Ypsilanti Community Utilities Authority
The project consists of sealing the masonry crack in the wall of the Bridge Road Pump Station, removing the existing retaining wall, restoring the ground slope, installing underdrain around the storage tank and repairing the concrete foundation.
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Ypsilanti Community Utilities Authority
Close: Dec 3, 2025
The project consists of sealing the masonry crack in the wall of the Bridge Road Pump Station, removing the existing retaining wall, restoring the ground slope, installing underdrain around the storage tank and repairing the concrete foundation.
AvailableCity of Charlotte
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
City of Charlotte
Close: Dec 19, 2025
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
AvailableTownship of Warren
The work required under the contract shall consist of, but is not limited to, mobilization, traffic control, removal and disposal of the existing pumping system including all pumps, piping, valves, wiring, conduit and pipe and equipment supports, new wet well coating, installation of new pumps, piping, power/controls, above grade valve vault and all other appurtenances, bypass pumping, startup, testing, warrantees, guarantees, training and other work incidental to the full completion of the project in accordance with the plans and specifications. The pump station operations or bypass pumping are to be maintained 24/7 throughout the duration of the project without interrupted wastewater flow.
Posted Date
Nov 3, 2025
Due Date
Dec 2, 2025
Release: Nov 3, 2025
Township of Warren
Close: Dec 2, 2025
The work required under the contract shall consist of, but is not limited to, mobilization, traffic control, removal and disposal of the existing pumping system including all pumps, piping, valves, wiring, conduit and pipe and equipment supports, new wet well coating, installation of new pumps, piping, power/controls, above grade valve vault and all other appurtenances, bypass pumping, startup, testing, warrantees, guarantees, training and other work incidental to the full completion of the project in accordance with the plans and specifications. The pump station operations or bypass pumping are to be maintained 24/7 throughout the duration of the project without interrupted wastewater flow.
AvailableCape Fear Public Utility Authority
Work consist of booster pump station and waterline interconnect, 16" water transmission main, installed water main crossing, existing 16" water main, existing 12" water main, elevated tank more.
Posted Date
-
Due Date
Nov 18, 2025
Cape Fear Public Utility Authority
Close: Nov 18, 2025
Work consist of booster pump station and waterline interconnect, 16" water transmission main, installed water main crossing, existing 16" water main, existing 12" water main, elevated tank more.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis