Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Warren
The work required under the contract shall consist of, but is not limited to, mobilization, traffic control, removal and disposal of the existing pumping system including all pumps, piping, valves, wiring, conduit and pipe and equipment supports, new wet well coating, installation of new pumps, piping, power/controls, above grade valve vault and all other appurtenances, bypass pumping, startup, testing, warrantees, guarantees, training and other work incidental to the full completion of the project in accordance with the plans and specifications. The pump station operations or bypass pumping are to be maintained 24/7 throughout the duration of the project without interrupted wastewater flow.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Ferndale
1 LS pump station no. 16 upgrade, 1 FA city SCADA/PLC programmer services, 1 LS excavation/trench safety system, 1 LS reroute power service to site, 8 EA bollards, 50 TN extra crushed surfacing base course.
Posted Date
Oct 15, 2025
Due Date
Nov 18, 2025
Release: Oct 15, 2025
City of Ferndale
Close: Nov 18, 2025
1 LS pump station no. 16 upgrade, 1 FA city SCADA/PLC programmer services, 1 LS excavation/trench safety system, 1 LS reroute power service to site, 8 EA bollards, 50 TN extra crushed surfacing base course.
Ypsilanti Community Utilities Authority
The project consists of sealing the masonry crack in the wall of the Bridge Road Pump Station, removing the existing retaining wall, restoring the ground slope, installing underdrain around the storage tank and repairing the concrete foundation.
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Ypsilanti Community Utilities Authority
Close: Dec 3, 2025
The project consists of sealing the masonry crack in the wall of the Bridge Road Pump Station, removing the existing retaining wall, restoring the ground slope, installing underdrain around the storage tank and repairing the concrete foundation.
AvailableCity of Dallas
Construction of the Hillcrest Road Pump Station House per the construction documents prepared by Jacobs Engineering. The bids are for construction of an enclosure around the existing pump station equipment to simulate the style of surrounding residential houses in the area. The construction will include the house as a base bid and ten alternates for site development items, security, and monitoring improvements to the facility.
Posted Date
Sep 17, 2025
Due Date
Nov 21, 2025
Release: Sep 17, 2025
City of Dallas
Close: Nov 21, 2025
Construction of the Hillcrest Road Pump Station House per the construction documents prepared by Jacobs Engineering. The bids are for construction of an enclosure around the existing pump station equipment to simulate the style of surrounding residential houses in the area. The construction will include the house as a base bid and ten alternates for site development items, security, and monitoring improvements to the facility.
AvailableCounty of Ventura
Project consists of construction of a uv disinfection system for tertiary treatment of recycled water and to upgrade the existing pump station 1 with an additional pump and motor controls.
Posted Date
Oct 21, 2025
Due Date
Nov 20, 2025
Release: Oct 21, 2025
County of Ventura
Close: Nov 20, 2025
Project consists of construction of a uv disinfection system for tertiary treatment of recycled water and to upgrade the existing pump station 1 with an additional pump and motor controls.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis