Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Thompson's Station
Project consists of approx 11,000 FT of 18" gravity sewer; 43 new manholes; and all related appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Sewalls Point
Work includes re-line and reconstruct existing dry sewer line. The gravity lines, service lines and some force main/lpfm will need to be cleaned, videoed and then roots/obstructions removed, cleaned, relined, lateral services cut and relined, tested. Some lines may need to be repaired and relocated if settlements encountered.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Town of Sewalls Point
Close: Dec 18, 2025
Work includes re-line and reconstruct existing dry sewer line. The gravity lines, service lines and some force main/lpfm will need to be cleaned, videoed and then roots/obstructions removed, cleaned, relined, lateral services cut and relined, tested. Some lines may need to be repaired and relocated if settlements encountered.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Barnesville
The City of Barnesville seeks construction services to install approximately 2,974 linear feet of 21" PVC gravity sewer, additional lengths of ductile iron and PVC sewer mains, construct manholes, and perform related site work. The contract includes requirements for bonds, insurance, Georgia utility contractor licensing, E-Verify registration, and a 240-calendar-day period of performance.
Posted Date
-
Due Date
Jan 7, 2026
City of Barnesville
Close: Jan 7, 2026
The City of Barnesville seeks construction services to install approximately 2,974 linear feet of 21" PVC gravity sewer, additional lengths of ductile iron and PVC sewer mains, construct manholes, and perform related site work. The contract includes requirements for bonds, insurance, Georgia utility contractor licensing, E-Verify registration, and a 240-calendar-day period of performance.
AvailableCity of Barnesville
Work consists of sewer improvements, includes 380 LF of 21" pvc (ps115) sanitary sewer pipe; 1,209 LF of 21" pvc (ps115) sanitary sewer pipe; 152 LF of 20" dip (class 250) sanitary sewer pipe; 3,673 LF of sanitary sewer video inspection (post construction); 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru consolidated rock - includes ductile iron carrier pipe; 1,000 TON of trench stabilization; 600 CY of rock removal base cost; 504 SY of class "a" pavement replacement; 68 SY of gravel to replace asphalt (sheet 9); 3,504 LF of mulching and grassing; 8,034 LF of silt fence - type c; 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru soil & friable weathered rock - includes ductile iron carrier pipe (in lieu of item 19).
Posted Date
Nov 20, 2025
Due Date
Jan 7, 2026
Release: Nov 20, 2025
City of Barnesville
Close: Jan 7, 2026
Work consists of sewer improvements, includes 380 LF of 21" pvc (ps115) sanitary sewer pipe; 1,209 LF of 21" pvc (ps115) sanitary sewer pipe; 152 LF of 20" dip (class 250) sanitary sewer pipe; 3,673 LF of sanitary sewer video inspection (post construction); 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru consolidated rock - includes ductile iron carrier pipe; 1,000 TON of trench stabilization; 600 CY of rock removal base cost; 504 SY of class "a" pavement replacement; 68 SY of gravel to replace asphalt (sheet 9); 3,504 LF of mulching and grassing; 8,034 LF of silt fence - type c; 115 LF of install 30" steel casing (. 469" wt) by jack & bore thru soil & friable weathered rock - includes ductile iron carrier pipe (in lieu of item 19).
AvailableCity of Mandan
Construction of approx., 1900 LF of 8" and 15" gravity sewer and other wastewater collection system improvements.
Posted Date
Nov 20, 2025
Due Date
Dec 19, 2025
Release: Nov 20, 2025
City of Mandan
Close: Dec 19, 2025
Construction of approx., 1900 LF of 8" and 15" gravity sewer and other wastewater collection system improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →