Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
THE PROJECT consists of furnishing all materials and equipment and performing all labor necessary to upgrade and expand the Hightower Water Treatment Plant and related equipment and appurtenances to a total treatment capacity of 6.9 million gallons per day. The project generally consists of the following major components of work and appurtenances: Expansion and Modification of the WTP Raw Water Intake & Pump Station; Creek Reservoir Flow Control Structure; New Sedimentation Basin Mechanical Sludge Removal Equipment; Modernization of Gravity Filters No. 1 - 4; New Bulk Chemical Feed Facilities for Phosphate and Sodium Permanganate; New Chlorine Feed Application Points Upstream of Filters; Upgrades to Existing Chemical Feed Facilities; Clearwell No. 2 Piping Modifications; Miscellaneous Piping Upgrades and Modifications; Electrical and Instrumentation Upgrades and Modifications; and Related Equipment and Appurtenances Detailed in the Specifications and Shown on the Contract Drawings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide Southside Water Reclamation Facility Expansion to 9.0 MGD.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southside Water Reclamation Facility Expansion to 9.0 MGD.
AvailableConstruction of 2.0 MGD wastewater treatment plant expansion.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Close: Jan 8, 2026
Construction of 2.0 MGD wastewater treatment plant expansion.
AvailableExpansion of the existing 15-MGD water treatment plant (with 20-mgd headworks) on Riedel Road, Crofton Meadows, Maryland to 20-MGD nominal capacity. The work includes, but is not limited to, constructing new aerators, flocculation basins, sedimentation basins, filters, thickener, clearwell, high lift pumping station upgrade, backwash holding tank, backwash surge tank upgrades, generators, chemical systems upgrade, yard piping, dewatering, grading, site work, paving and landscaping. Furnish and install all equipment, materials, labor, structures, site work, piping, test pits, testing, accessories, appurtenances and all other required work.
Posted Date
Nov 3, 2025
Due Date
Jan 13, 2026
Release: Nov 3, 2025
Close: Jan 13, 2026
Expansion of the existing 15-MGD water treatment plant (with 20-mgd headworks) on Riedel Road, Crofton Meadows, Maryland to 20-MGD nominal capacity. The work includes, but is not limited to, constructing new aerators, flocculation basins, sedimentation basins, filters, thickener, clearwell, high lift pumping station upgrade, backwash holding tank, backwash surge tank upgrades, generators, chemical systems upgrade, yard piping, dewatering, grading, site work, paving and landscaping. Furnish and install all equipment, materials, labor, structures, site work, piping, test pits, testing, accessories, appurtenances and all other required work.
The Village of Rockville Centre is soliciting sealed bids for a controls upgrade to Engine Generators 9 and 10. Bids are due by 11:00 AM prevailing time on January 6, 2026, with bid documents available via the Village’s Purchasing page upon registration. A recommended site walkthrough is to be completed by December 19, 2025, and questions are due by December 29, 2025.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
The Village of Rockville Centre is soliciting sealed bids for a controls upgrade to Engine Generators 9 and 10. Bids are due by 11:00 AM prevailing time on January 6, 2026, with bid documents available via the Village’s Purchasing page upon registration. A recommended site walkthrough is to be completed by December 19, 2025, and questions are due by December 29, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis