Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrading or replacement of high mast light towers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace high mast light #4. Replacing one (1) 100' Carolina or equivalent high mast pole including new cables, wires, and LED fixtures. The contractor will remove and dispose of the existing 100' pole and lighting fixture.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Replace high mast light #4. Replacing one (1) 100' Carolina or equivalent high mast pole including new cables, wires, and LED fixtures. The contractor will remove and dispose of the existing 100' pole and lighting fixture.
AvailablePremium
Access the largest public sector contact database
The vendor will provide for purchase and delivery 162 LED Fixture: Optical Requirements: a) Input power: 750W; b) Color temperature: 5700K; c) Lumen (Tolerance: -10%): 93,750-101,250; d) Efficacy: 125-135 LM/W; e) CRI: >70; f) Color Consistency: <6 steps or <6 SDCM; g) BUG: B4-U0-G5; h) Distribution Pattern: 40 degrees; i) Beam Angle: 40 degrees. See attached file.
Posted Date
Dec 11, 2025
Due Date
Dec 17, 2025
Release: Dec 11, 2025
Close: Dec 17, 2025
The vendor will provide for purchase and delivery 162 LED Fixture: Optical Requirements: a) Input power: 750W; b) Color temperature: 5700K; c) Lumen (Tolerance: -10%): 93,750-101,250; d) Efficacy: 125-135 LM/W; e) CRI: >70; f) Color Consistency: <6 steps or <6 SDCM; g) BUG: B4-U0-G5; h) Distribution Pattern: 40 degrees; i) Beam Angle: 40 degrees. See attached file.
AvailablePoles: 1. Vibration dampers on all poles; 2. Shipping included on orders of 5 or more poles from the same manufacturer; 3. Submit shop drawings for all poles; 4. No anchor bolts for pole orders.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Poles: 1. Vibration dampers on all poles; 2. Shipping included on orders of 5 or more poles from the same manufacturer; 3. Submit shop drawings for all poles; 4. No anchor bolts for pole orders.
AvailableRehabilitation and repair of light poles at MIA Building 714, including removal, pedestal reconstruction, new pole installation, and waterproofing.
Posted Date
Jan 13, 2026
Due Date
Feb 4, 2026
Release: Jan 13, 2026
Close: Feb 4, 2026
Rehabilitation and repair of light poles at MIA Building 714, including removal, pedestal reconstruction, new pole installation, and waterproofing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis