Summary
Design-build project to include – replacing all of the windows; replacing the main entrance storefront, vestibule and doors; replacing the main entrance canopy; replacing secondary exterior doors and associated frames; connecting all doors included as part of the existing access control and security systems; cleaning and repairing the retaining walls at the front of the building; cleaning all concrete walks and ramps; repairing or replacing all damaged concrete walks and ramps; repairing or replacing all railings, and guardrails; installing new bike racks; making improvements to the plaza/courtyard on the south side of the building to include new landscaping and exterior furniture; installing new exterior lighting; cleaning the south elevation; repaving and restriping the staff parking lot; and installing a new landscaping solution. See attached file and outside link.