Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The heli hydrant project consists of construction of new water facilities (including a pump house, 22,000-gallon reservoir, and 8,000-gallon heli hydrant), pipelines, and various appurtenances).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Chino Hills seeks bids for construction of a Heli-Hydrant fire protection system, including site preparation, installation of recycled water piping and appurtenances, fencing, drainage, and the complete heli-hydrant assembly. The work includes mobilization; clearing/grubbing; grading and excavation; installing 8-inch purple PVC C900 water line, valves, bends, meter, and related drainage improvements; and reconstructing a v-ditch. The engineer’s estimate is $422,000 and the project duration is 30 working days.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
The City of Chino Hills seeks bids for construction of a Heli-Hydrant fire protection system, including site preparation, installation of recycled water piping and appurtenances, fencing, drainage, and the complete heli-hydrant assembly. The work includes mobilization; clearing/grubbing; grading and excavation; installing 8-inch purple PVC C900 water line, valves, bends, meter, and related drainage improvements; and reconstructing a v-ditch. The engineer’s estimate is $422,000 and the project duration is 30 working days.
Premium
Access the largest public sector contact database
Work consist of unclassified excavation, furnish and install d. I. Tee with thrust block, furnish and install 8" purple PVC c900 water line, furnish and install 8" gate valve, furnish and install D.I. horizontal bend with thrust block, furnish and install 8" master meter water meter, furnish and install 4" c900 PVC drain pipe, furnish and install 6" c900 PVC drain pipe, furnish and install 6' tall chain link fence with 12' access gate, remove and reconstruct v-ditch, and furnish and install heli-hydrant assembly complete.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Work consist of unclassified excavation, furnish and install d. I. Tee with thrust block, furnish and install 8" purple PVC c900 water line, furnish and install 8" gate valve, furnish and install D.I. horizontal bend with thrust block, furnish and install 8" master meter water meter, furnish and install 4" c900 PVC drain pipe, furnish and install 6" c900 PVC drain pipe, furnish and install 6' tall chain link fence with 12' access gate, remove and reconstruct v-ditch, and furnish and install heli-hydrant assembly complete.
AvailableFire Hydrant Project.
Posted Date
Dec 12, 2025
Due Date
Dec 26, 2025
Release: Dec 12, 2025
Close: Dec 26, 2025
Fire Hydrant Project.
AvailableThe Fire Hydrant Project involves the replacement and installation of a new fire hydrant assembly. The project requires coordination with the Toledo Water Department and Ohio Underground Protection Services. The scope of work includes excavating the fire hydrant, removing and disposing of the old assembly, providing and installing a new 5&1/4 fire hydrant assembly, and backfilling the trench area. The awarded supplier must include all applicable costs for delivery, setup, and warranty in their submission.
Posted Date
Dec 12, 2025
Due Date
Dec 26, 2025
Release: Dec 12, 2025
Close: Dec 26, 2025
The Fire Hydrant Project involves the replacement and installation of a new fire hydrant assembly. The project requires coordination with the Toledo Water Department and Ohio Underground Protection Services. The scope of work includes excavating the fire hydrant, removing and disposing of the old assembly, providing and installing a new 5&1/4 fire hydrant assembly, and backfilling the trench area. The awarded supplier must include all applicable costs for delivery, setup, and warranty in their submission.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis