Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
New solution for our semi-private inpatient rooms to enhance patient privacy, minimize the impacts of hospital noise, and ease the workload on our laundry and environmental services staff. Each semi-private room has two (2) bays, each about 10' L x 8' W with 108" high ceilings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Posted Date
Aug 22, 2025
Due Date
Jan 9, 2026
Release: Aug 22, 2025
Close: Jan 9, 2026
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD HBMC RFP Linear Accelator (LINAC) Addition. construction of a new, one-story linear accelerator radiation treatment addition on the west side of the structure. This addition will comprise a fully enclosed building expansion designed to accommodate the shielding specifications required for the designated linear accelerator equipment and associated treatment vault. The scope further includes the integration of exterior walls and a roofing system that will structurally and functionally tie into the existing first floor of MOB1
Posted Date
Dec 28, 2025
Due Date
Jan 23, 2026
Release: Dec 28, 2025
Close: Jan 23, 2026
DESIGN-BUILD HBMC RFP Linear Accelator (LINAC) Addition. construction of a new, one-story linear accelerator radiation treatment addition on the west side of the structure. This addition will comprise a fully enclosed building expansion designed to accommodate the shielding specifications required for the designated linear accelerator equipment and associated treatment vault. The scope further includes the integration of exterior walls and a roofing system that will structurally and functionally tie into the existing first floor of MOB1
AvailableSecurity Window Film Stage Curtains and Draperies Stage.
Posted Date
Aug 26, 2025
Due Date
Jan 13, 2026
Release: Aug 26, 2025
Close: Jan 13, 2026
Security Window Film Stage Curtains and Draperies Stage.
AvailableProvide stage curtains and draperies.
Posted Date
Aug 26, 2025
Due Date
Jan 13, 2026
Release: Aug 26, 2025
Close: Jan 13, 2026
Provide stage curtains and draperies.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →