Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal and offsite disposal of the old radiator, supplying and installing new radiator, and restoring generator to operational condition. The awarded contractor is solely responsible for acquiring all other contracted services needed to perform the tasks of replacing the radiator on this generator.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
LWS N 56th Street pump station engine generator project.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Close: Dec 12, 2025
LWS N 56th Street pump station engine generator project.
Premium
Access the largest public sector contact database
Includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kw generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 vac and 480 vac services serving the pump station, aeration building, and dam equipment; and coordination with the owner's integrator for required scada system modifications.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kw generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 vac and 480 vac services serving the pump station, aeration building, and dam equipment; and coordination with the owner's integrator for required scada system modifications.
AvailableIncludes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kw generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 vac and 480 vac services serving the pump station, aeration building, and dam equipment; and coordination with the owner's integrator for required scada system modifications.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kw generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 vac and 480 vac services serving the pump station, aeration building, and dam equipment; and coordination with the owner's integrator for required scada system modifications.
AvailableWork includes replacement and upsizing of existing 125-hp pumps to 280-hp pumps, replacement and upsizing of existing standby generator (from 400 kw to mkw natural gas-powered generator), replacement of variable frequency drives (vfds), platforms for generator and transformers, electrical upgrades, installation of hvac, rest room, and other miscellaneous improvements to the pump station
Posted Date
Oct 22, 2025
Due Date
Dec 16, 2025
Release: Oct 22, 2025
Close: Dec 16, 2025
Work includes replacement and upsizing of existing 125-hp pumps to 280-hp pumps, replacement and upsizing of existing standby generator (from 400 kw to mkw natural gas-powered generator), replacement of variable frequency drives (vfds), platforms for generator and transformers, electrical upgrades, installation of hvac, rest room, and other miscellaneous improvements to the pump station
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.