Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
3,500 SY - sawcut and remove asphalt; 4 ea - remove fire hydrant; 65 ea - remove, preserve and relocate existing meter box assembly; 133 LF - 6" PVC water line; 4,595 LF - 12" PVC water line; 4 ea - 12"x16" tee; 4 ea - 6" gate valve.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of approx 283 LF of 12" PVC C900 DR18; 114 TON of 5" thick HMA; Jack and Bore 12" carrier, 20" Steel Casing; 2 EA of 12" Butterfly Valve. See outside link.
Posted Date
Jan 7, 2026
Due Date
Jan 22, 2026
Release: Jan 7, 2026
Close: Jan 22, 2026
Project consists of approx 283 LF of 12" PVC C900 DR18; 114 TON of 5" thick HMA; Jack and Bore 12" carrier, 20" Steel Casing; 2 EA of 12" Butterfly Valve. See outside link.
AvailableThe Lafayette Parish Waterworks District North is soliciting sealed bids for furnishing and installing water lines, fittings, valves, and related components for the Landry Road Waterline Extension Project Phase 2 from Tabb Road to the Scott waterline tie-in. Bidding documents may be obtained electronically via CentralBidding or as hard copies at the Lafayette Parish Waterworks District North office; sealed bids may be submitted electronically via CentralBidding or in person. Bids are due at 10:00 a.m. on February 4, 2026, and late bids will be returned unopened.
Posted Date
Jan 6, 2026
Due Date
Feb 4, 2026
Release: Jan 6, 2026
Close: Feb 4, 2026
The Lafayette Parish Waterworks District North is soliciting sealed bids for furnishing and installing water lines, fittings, valves, and related components for the Landry Road Waterline Extension Project Phase 2 from Tabb Road to the Scott waterline tie-in. Bidding documents may be obtained electronically via CentralBidding or as hard copies at the Lafayette Parish Waterworks District North office; sealed bids may be submitted electronically via CentralBidding or in person. Bids are due at 10:00 a.m. on February 4, 2026, and late bids will be returned unopened.
AvailableThe City of Salinas requests Statements of Qualifications (RFQual) for professional engineering design services for the Boronda Road Congestion Relief Phase 2 project (CIP 9510), covering ~1.1 miles of East Boronda Road including multi-lane roundabouts, stormwater treatment, shared-use paths, bike lanes, bus pullouts, sidewalks, ADA ramps, utility coordination and related improvements. The procurement is a qualifications-based solicitation (RFQual); SOQs must be submitted electronically via PlanetBids by the stated due date.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The City of Salinas requests Statements of Qualifications (RFQual) for professional engineering design services for the Boronda Road Congestion Relief Phase 2 project (CIP 9510), covering ~1.1 miles of East Boronda Road including multi-lane roundabouts, stormwater treatment, shared-use paths, bike lanes, bus pullouts, sidewalks, ADA ramps, utility coordination and related improvements. The procurement is a qualifications-based solicitation (RFQual); SOQs must be submitted electronically via PlanetBids by the stated due date.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →