Summary
Haul formula when determining which supplier will be used for a specific project. The haul formula is as follows: $1.50 for the 1st mile, $0.25 for each additional mile. 307-01.10 BPMB-HM GRADE CW 2,287 Ton. Note: All items are being bid FOB. Note: This mix can have RAP but no more than 10%. Note: No (RAS) will be included in this mix. Note: The Hot Mix for this contract is being let under the QA guidelines with the exception that the Producer, not the Contractor, will be responsible for running the tests and filling out the daily reports required by T.D.O.T. on hot mix. The cost for this work by the Producer will be included in the price bid for hot mix. Note: This project is being let contingent upon State Aid Funds being available and cannot be started until the Commissioner of Transportation has signed the contract.