Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Work of Project consists of: Phase 2 shell and interior fit-out work for a new Health and Wellness facility. Scope shall include construction of an approx. 25,000 SF two-story structure with immediate site and utility work. Facility includes classrooms and labs as well as ancillary offices and support areas. Services are expected to commence immediately.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construct the new health and wellness complex.
Posted Date
Dec 29, 2025
Due Date
Jan 21, 2026
Release: Dec 29, 2025
Close: Jan 21, 2026
Construct the new health and wellness complex.
AvailableProcurement of daily and event cleaning services for the Hoover Met Complex.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
Procurement of daily and event cleaning services for the Hoover Met Complex.
AvailableThe project is for full replacement of the existing ballasted EPDM roof system at the Bemidji State University PE Complex with a new gravel-surfaced built-up roof. Work includes new through-wall flashing at masonry transitions, minor modifications to roof drainage, and limited replacement of mechanical equipment at new access ladders and safety railings. Bemidji State University (part of the Minnesota State system) is soliciting contractors for this construction project; instructions and documents are available from the source posting (QuestCDN link) referenced on the aggregator page.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
The project is for full replacement of the existing ballasted EPDM roof system at the Bemidji State University PE Complex with a new gravel-surfaced built-up roof. Work includes new through-wall flashing at masonry transitions, minor modifications to roof drainage, and limited replacement of mechanical equipment at new access ladders and safety railings. Bemidji State University (part of the Minnesota State system) is soliciting contractors for this construction project; instructions and documents are available from the source posting (QuestCDN link) referenced on the aggregator page.
Construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures.
Posted Date
Sep 16, 2025
Due Date
Jan 23, 2026
Release: Sep 16, 2025
Close: Jan 23, 2026
Construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis