Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Golden State Connect Authority (GSCA) is issuing a Request for Bids to design and construct the Glenn County Outside Plant (OSP) Phase 1 fiber construction, including installation of conduit, handholes/vaults, fiber-optic cable, splice closures, termination panels, and associated hut/electrical systems. The estimated construction cost is $7,000,000, the project requires prevailing wages and specified contractor licenses (Class A or Class C-34 with C-10), and requires performance/payment bonds plus insurance. Bids are submitted electronically through the GSCA Procurement Portal; a mandatory pre-bid meeting, question deadlines, addenda, and a sealed bid opening schedule are published on the buyer portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 228,281 LF conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing); 1,143 EA handhole/vaults furnish and installation; 228,415 LF trace wire furnish and installation; 274,226 LF fiber optic cable furnish and installation into conduit system; 12,962 SF surface restoration; 402 EA splice closures/trays furnish and installation; 76 ea termination panels and trays installation; 1,762 ea fiber splices/terminations and testing 11,414 LF conduit system furnish and installation (mainline trenching); 1 LF conduit system furnish and installation (mainline micro trenching).
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work includes 228,281 LF conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing); 1,143 EA handhole/vaults furnish and installation; 228,415 LF trace wire furnish and installation; 274,226 LF fiber optic cable furnish and installation into conduit system; 12,962 SF surface restoration; 402 EA splice closures/trays furnish and installation; 76 ea termination panels and trays installation; 1,762 ea fiber splices/terminations and testing 11,414 LF conduit system furnish and installation (mainline trenching); 1 LF conduit system furnish and installation (mainline micro trenching).
The Golden State Connect Authority (GSCA) is soliciting bids to design and construct Phase 1 of the Amador County outside plant (OSP) broadband fiber‑optic network, which includes extensive conduit and fiber installation, handholes, splice closures, and telecommunications huts at multiple locations. The project requires specialized contractor licensing (Class A, or C‑34 + C‑10), compliance with California prevailing wage and bonding/insurance requirements, and provides a construction schedule of 120 calendar days with liquidated damages for delays. Key procurement milestones include a mandatory pre‑bid meeting on 2026‑01‑07, questions due by 2026‑01‑21, answers by 2026‑01‑27, and bids due on 2026‑02‑06 via the buyer’s electronic procurement portal.
Posted Date
Dec 15, 2025
Due Date
Feb 6, 2026
Release: Dec 15, 2025
Close: Feb 6, 2026
Work consist of 209,946 LF of conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing), 639 EA of handhole/vaults furnish and installation, 209,946 LF of trace wire furnish and installation, 282,791 LF of fiber optic cable furnish and installation into conduit system, 2,705 SF of surface restoration, hut system installation, 270 EA of splice closures/trays furnish and installation, 39 EA of termination panels and trays installation, 1,674 EA of fiber splices/terminations and testing.
Posted Date
Dec 12, 2025
Due Date
Feb 6, 2026
Release: Dec 12, 2025
Close: Feb 6, 2026
Work consist of 209,946 LF of conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing), 639 EA of handhole/vaults furnish and installation, 209,946 LF of trace wire furnish and installation, 282,791 LF of fiber optic cable furnish and installation into conduit system, 2,705 SF of surface restoration, hut system installation, 270 EA of splice closures/trays furnish and installation, 39 EA of termination panels and trays installation, 1,674 EA of fiber splices/terminations and testing.
Provide broadband wide area network fiber optic services.
Posted Date
Dec 20, 2025
Due Date
Jan 30, 2026
Release: Dec 20, 2025
Close: Jan 30, 2026
Provide broadband wide area network fiber optic services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Golden State Connect Authority (GSCA) is soliciting bids to design and construct Phase 1 of the Amador County outside plant (OSP) broadband fiber‑optic network, which includes extensive conduit and fiber installation, handholes, splice closures, and telecommunications huts at multiple locations. The project requires specialized contractor licensing (Class A, or C‑34 + C‑10), compliance with California prevailing wage and bonding/insurance requirements, and provides a construction schedule of 120 calendar days with liquidated damages for delays. Key procurement milestones include a mandatory pre‑bid meeting on 2026‑01‑07, questions due by 2026‑01‑21, answers by 2026‑01‑27, and bids due on 2026‑02‑06 via the buyer’s electronic procurement portal.