Summary
Construction of a water booster station featuring a wood framed building with metal panel exterior, FRP interior wall covering, electrical, HVAC, process piping, pump controls, and all related accessories. Work includes mobilization 1 LS; remove existing meter station 1 LS; remove existing booster station 1 LS; strip, salvage, and reinstall topsoil 1047 SY; remove, relocate, reinstall SCADA pole 1 LS; fiber roll 50 LF; 4" PVC-CL 160 102 LF; 4" gate valve 3 EA; 4" fittings 6 EA; connect to existing 6 EA; booster station - complete 1 ls; electrical and controls 1 LS; storm sewer pipe - 18" CMP 50 LF; flared end section - 18" CMP 2 EA; common fill (import) 440 CY; subgrade preparation 281 SY; geosynthetic material type R1 281 SY; aggregate surface - class 13 100 ton; seeding and hydromulch .16 AC.