Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide installation of turf reinforcement matting and grading on stream banks, floodplain areas, gravel bar removal and portions of the stream channel. Work also includes the installation of several instream structures including root wads, log-framed stone deflectors, toe log cribbing, and a rock cross vane to properly redirect flows. Project also includes the installation of vegetated solutions on the stream bank as well as seeding and mulching of all disturbed areas including all those areas disturbed for access to the various work areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
Premium
Access the largest public sector contact database
Work will involve streambank grading and stabilization, in-stream structures, and erosion and sediment control measures, per guidelines to be given at the mandatory site showing.
Posted Date
Dec 5, 2025
Due Date
Jan 23, 2026
Release: Dec 5, 2025
Close: Jan 23, 2026
Work will involve streambank grading and stabilization, in-stream structures, and erosion and sediment control measures, per guidelines to be given at the mandatory site showing.
AvailableWork includes mobilization, selective site demolition, erosion and sediment controls, flow diversion, and removal of accumulated sediment to create a functional floodplain area with a baseflow channel that ties to the existing channel at the upstream extents and at the pedestrian bridge crossing at the Ninth Street Park property. Log sill and woody debris grade control structures will be installed to provide grade control across the restored system. The restored area will be planted as specified in the Drawings to provide native riparian buffer habitat.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Work includes mobilization, selective site demolition, erosion and sediment controls, flow diversion, and removal of accumulated sediment to create a functional floodplain area with a baseflow channel that ties to the existing channel at the upstream extents and at the pedestrian bridge crossing at the Ninth Street Park property. Log sill and woody debris grade control structures will be installed to provide grade control across the restored system. The restored area will be planted as specified in the Drawings to provide native riparian buffer habitat.
AvailableProvide construction services for the reconstruction of existing storm drain inlets, concrete curbing, and sidewalks.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Provide construction services for the reconstruction of existing storm drain inlets, concrete curbing, and sidewalks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis