Summary
Project consists of armory renovation. Work includes #1 demolition (l&m); #2 concrete (l&m); #3 masonry (l&m); #4 structural steel fabrication (m); #5 structural steel erection (l); #6 general trades (l&m); #7 millwork (m); #8 acoustical gypboard, work framing, (l&m); #9 hollow metal doors/hardware frames, wood doors, & hardware (m); #10 flooring and fluid applied flooring (l&m); #11 paints and coatings (l&m); #12 miscellaneous specialty items (m); #13 detention equipment (l&m); #14 food service equipment (l&m); #15 fire suppression systems (l&m); #16 plumbing and utilities (l&m); #17 hvac (l&m); #18 electrical (l&m); #19 specialty work (l&m).