Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of electrical activities work required to install the new wayside anchors (antennas) and associated power distribution for the Green Line Train Protection System. These installations will occur along the surface running portion and portal entries of the Green Line on the B, C, and E Branches.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for electrical activities to install new wayside anchors (antennas) and associated power distribution for the Green Line Train Protection System on the B, C, and E Branches.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
This RFP is for electrical activities to install new wayside anchors (antennas) and associated power distribution for the Green Line Train Protection System on the B, C, and E Branches.
AvailableThe Project consists of Contract #1-constructing three pickleball courts with stone base, 2 1/2" of 19mm, 1 1/2” of 9.5FG, ADA walkway, fencing, painting court, and installation of nets; Contract #2-installing a metal roof on Pavilion C and soffit/facia on all three pavilions; and Contract #3-installing and connecting solar panels on the 3 pavilions at Park.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The Project consists of Contract #1-constructing three pickleball courts with stone base, 2 1/2" of 19mm, 1 1/2” of 9.5FG, ADA walkway, fencing, painting court, and installation of nets; Contract #2-installing a metal roof on Pavilion C and soffit/facia on all three pavilions; and Contract #3-installing and connecting solar panels on the 3 pavilions at Park.
AvailableContract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Posted Date
Oct 16, 2025
Due Date
Jan 27, 2026
Release: Oct 16, 2025
Close: Jan 27, 2026
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
AvailableProvide both a new Light RailLink LRV Fleet and improvements/upgrades to the Light RailLink Train Control System.
Posted Date
Sep 12, 2025
Due Date
Feb 3, 2026
Release: Sep 12, 2025
Close: Feb 3, 2026
Provide both a new Light RailLink LRV Fleet and improvements/upgrades to the Light RailLink Train Control System.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →