Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractors will be responsible for maintaining a mix of bioretention, permeable pavements, green roofs, dry wells, flow restriction devices, overflow risers, inlets, inflow channels, and various types of gi facilities and stormwater underdrain systems, including local sewer connections at each gi facility, and other appurtenances related to the functionality of the green infrastructure facilities
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provision of qualified firms for specialized landscape and other maintenance services for green stormwater infrastructure (GSI) assets.
Posted Date
Apr 10, 2025
Due Date
Apr 10, 2030
Release: Apr 10, 2025
Close: Apr 10, 2030
Provision of qualified firms for specialized landscape and other maintenance services for green stormwater infrastructure (GSI) assets.
AvailablePremium
Access the largest public sector contact database
The Metropolitan Water Reclamation District of Greater Chicago (MWRD) solicits pre-applications from eligible public entities in Cook County for the Green Infrastructure Partnership Program, which reimburses construction costs for green infrastructure projects on public property through intergovernmental agreements. Pre-applications are due December 31, 2025, with full application finalization scheduled by March 6, 2026.
Posted Date
-
Due Date
Dec 31, 2025
Release: -
Close: Dec 31, 2025
The Metropolitan Water Reclamation District of Greater Chicago (MWRD) solicits pre-applications from eligible public entities in Cook County for the Green Infrastructure Partnership Program, which reimburses construction costs for green infrastructure projects on public property through intergovernmental agreements. Pre-applications are due December 31, 2025, with full application finalization scheduled by March 6, 2026.
AvailableThe District of Columbia Water and Sewer Authority (DC Water) issued Solicitation DCW-SOL-25-10473 for Green Infrastructure Maintenance seeking qualified contractors to perform maintenance of bioretention areas, permeable pavements, green roofs, dry wells, flow restriction devices, overflow risers, inlets, inflow channels, stormwater underdrain systems, and associated appurtenances. The contract has a base term of three years with two one-year options and work will be performed within the District of Columbia; bidder requirements include Service Contract Act compliance, participation in the CBE Inclusion Program (50% utilization goal), bonding, disclosure of conflicts of interest, and required insurance. HigherGov lists the posting date as Dec 4, 2025 and a response deadline of Jan 7, 2026; HigherGov also links to the original buyer posting on DC Water’s Oracle Cloud procurement portal.
Posted Date
Dec 4, 2025
Due Date
Jan 7, 2026
Release: Dec 4, 2025
Close: Jan 7, 2026
The District of Columbia Water and Sewer Authority (DC Water) issued Solicitation DCW-SOL-25-10473 for Green Infrastructure Maintenance seeking qualified contractors to perform maintenance of bioretention areas, permeable pavements, green roofs, dry wells, flow restriction devices, overflow risers, inlets, inflow channels, stormwater underdrain systems, and associated appurtenances. The contract has a base term of three years with two one-year options and work will be performed within the District of Columbia; bidder requirements include Service Contract Act compliance, participation in the CBE Inclusion Program (50% utilization goal), bonding, disclosure of conflicts of interest, and required insurance. HigherGov lists the posting date as Dec 4, 2025 and a response deadline of Jan 7, 2026; HigherGov also links to the original buyer posting on DC Water’s Oracle Cloud procurement portal.
AvailableThe Project is generally described as including but not limited to: Green Infrastructure Project encompassing the removal of asphalt. Stormwater capture systems. Introduction of native vegetation.
Posted Date
Nov 5, 2025
Due Date
Dec 16, 2025
Release: Nov 5, 2025
Close: Dec 16, 2025
The Project is generally described as including but not limited to: Green Infrastructure Project encompassing the removal of asphalt. Stormwater capture systems. Introduction of native vegetation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis