Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition and removal of two existing rooftop units and associated piping, valves, venting, electrical connections, and associated equipment and sourcing and installation of two new rooftop units, valves, venting, piping, electrical connections, and associated equipment, testing, permitting, and inspections necessary to operate the rooftop units.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
To replace a 25-ton rooftop HVAC package unit at the City’s Advanced Water Purification Facility (“AWPF”) Visitors Center located at 5700 Perkins Road in Oxnard.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
To replace a 25-ton rooftop HVAC package unit at the City’s Advanced Water Purification Facility (“AWPF”) Visitors Center located at 5700 Perkins Road in Oxnard.
AvailablePremium
Access the largest public sector contact database
Replacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU).
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU).
AvailableRemoval/installation/startup of one rooftop air handler.
Posted Date
-
Due Date
Dec 21, 2025
Close: Dec 21, 2025
Removal/installation/startup of one rooftop air handler.
AvailableProject replaces roofing and a rooftop air handling unit. The project consists of replacement of existing rooftop unit, curb, exterior ductwork, roof membrane, roof insulation, peripherals and associated controls.
Posted Date
Dec 6, 2025
Due Date
Dec 18, 2025
Release: Dec 6, 2025
Close: Dec 18, 2025
Project replaces roofing and a rooftop air handling unit. The project consists of replacement of existing rooftop unit, curb, exterior ductwork, roof membrane, roof insulation, peripherals and associated controls.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis