Summary
The primary scope of this requirement shall be for the contractor to manufacture the completed Trusted Traveler sleeve product. This includes the printing of the sleeve and the insert. Orders are expected to occur once annually for materials on this contract. Production and delivery will be negotiated and scheduled cooperatively with GSID Inventory Managers. If an additional order is placed after the annual volume order, the pricing bracket for that additional order shall be the same as the initial annual volume or next lower priced volume price break. The subsequent order shall be considered in addition to the original order volume. Due to the expected production planning and ongoing production of the materials, it is expected that there will not be any low volume setup costs incurred during this additional volume order as production is already ongoing. See attached file.