Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Mountain City
Restore this facility to its pre-disaster design, function, and capacity within the existing footprint. Involves removal of debris and to repair asphalt, concrete, and wood along this section of Goose Creek Trail (36.475954, -81.809950). Scope of work: Demolish broken section of trail and remove debris, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 5 CY of Asphalt - No base needed, 49 FT long x 8 FT wide x 4 IN deep, Replace 1.2 CY of Concrete, 9 FT long x 11 FT wide x 4 IN deep, Replace 2 x 8 Wood railings, 11 FT long, Replace 2 x 11 Wood railings, 11 FT long. The damage was caused by Hurricane Helene.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Forsyth County
Provide big creek greenway boardwalk maintenance and repairs as needed.
Posted Date
Sep 25, 2025
Due Date
Dec 4, 2025
Release: Sep 25, 2025
Forsyth County
Close: Dec 4, 2025
Provide big creek greenway boardwalk maintenance and repairs as needed.
AvailableIllinois Department of Natural Resources
Replacement of existing overlook structure and trail bridge along with trail rehab due to erosion. Work will consist of constructing a boardwalk, pedestrian bridge, outlook, and railings. The work shall include removal of existing structures and concrete, boring and pouring concrete footings, installing new posts, decking, railing, wood structures, grading and shaping landscaping. The contract will have an initial term commencing upon last signature of the parties and ending on June 30, 2026.
Posted Date
Sep 19, 2025
Due Date
Nov 27, 2025
Release: Sep 19, 2025
Illinois Department of Natural Resources
Close: Nov 27, 2025
Replacement of existing overlook structure and trail bridge along with trail rehab due to erosion. Work will consist of constructing a boardwalk, pedestrian bridge, outlook, and railings. The work shall include removal of existing structures and concrete, boring and pouring concrete footings, installing new posts, decking, railing, wood structures, grading and shaping landscaping. The contract will have an initial term commencing upon last signature of the parties and ending on June 30, 2026.
AvailableLouisiana Division of Administration
Storage tank repairs.
Posted Date
Oct 3, 2025
Due Date
Nov 25, 2025
Release: Oct 3, 2025
Louisiana Division of Administration
Close: Nov 25, 2025
Storage tank repairs.
AvailableCity of Poteau
Project including concrete and asphalt paving, road way patching, grading and drainage, retaining walls, solid slab sodding, signage, and striping.
Posted Date
Aug 7, 2025
Due Date
Nov 20, 2025
Release: Aug 7, 2025
City of Poteau
Close: Nov 20, 2025
Project including concrete and asphalt paving, road way patching, grading and drainage, retaining walls, solid slab sodding, signage, and striping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis