Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Poteau
Project including concrete and asphalt paving, road way patching, gradÂing and drainage, reÂtaining walls, solid slab sodding, sigÂnage, and striping.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Metro Water Reclamation Of Greater Chicago
Rehabilitate side-dump railroad cars.
Posted Date
Sep 3, 2025
Due Date
Nov 18, 2025
Release: Sep 3, 2025
Metro Water Reclamation Of Greater Chicago
Close: Nov 18, 2025
Rehabilitate side-dump railroad cars.
Town of Mountain City
Restore this facility to its pre-disaster design, function, and capacity within the existing footprint. Involves removal of debris and to repair asphalt, concrete, and wood along this section of Goose Creek Trail (36.475954, -81.809950). Scope of work: Demolish broken section of trail and remove debris, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 5 CY of Asphalt - No base needed, 49 FT long x 8 FT wide x 4 IN deep, Replace 1.2 CY of Concrete, 9 FT long x 11 FT wide x 4 IN deep, Replace 2 x 8 Wood railings, 11 FT long, Replace 2 x 11 Wood railings, 11 FT long. The damage was caused by Hurricane Helene.
Posted Date
Sep 10, 2025
Due Date
Nov 18, 2025
Release: Sep 10, 2025
Town of Mountain City
Close: Nov 18, 2025
Restore this facility to its pre-disaster design, function, and capacity within the existing footprint. Involves removal of debris and to repair asphalt, concrete, and wood along this section of Goose Creek Trail (36.475954, -81.809950). Scope of work: Demolish broken section of trail and remove debris, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 5 CY of Asphalt - No base needed, 49 FT long x 8 FT wide x 4 IN deep, Replace 1.2 CY of Concrete, 9 FT long x 11 FT wide x 4 IN deep, Replace 2 x 8 Wood railings, 11 FT long, Replace 2 x 11 Wood railings, 11 FT long. The damage was caused by Hurricane Helene.
Illinois Department of Natural Resources
Replacement of existing overlook structure and trail bridge along with trail rehab due to erosion. Work will consist of constructing a boardwalk, pedestrian bridge, outlook, and railings. The work shall include removal of existing structures and concrete, boring and pouring concrete footings, installing new posts, decking, railing, wood structures, grading and shaping landscaping. The contract will have an initial term commencing upon last signature of the parties and ending on June 30, 2026.
Posted Date
Sep 19, 2025
Due Date
Nov 27, 2025
Release: Sep 19, 2025
Illinois Department of Natural Resources
Close: Nov 27, 2025
Replacement of existing overlook structure and trail bridge along with trail rehab due to erosion. Work will consist of constructing a boardwalk, pedestrian bridge, outlook, and railings. The work shall include removal of existing structures and concrete, boring and pouring concrete footings, installing new posts, decking, railing, wood structures, grading and shaping landscaping. The contract will have an initial term commencing upon last signature of the parties and ending on June 30, 2026.
AvailableFreeport Park District
The Project involves repairing a trail bridge structure, including steel pile driving and concrete formwork.
Posted Date
May 10, 2024
Due Date
Nov 25, 2025
Release: May 10, 2024
Freeport Park District
Close: Nov 25, 2025
The Project involves repairing a trail bridge structure, including steel pile driving and concrete formwork.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis