Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Forsyth County
Provide big creek greenway boardwalk maintenance and repairs as needed.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Mountain City
Restore this facility to its pre-disaster design, function, and capacity within the existing footprint. Involves removal of debris and to repair asphalt, concrete, and wood along this section of Goose Creek Trail (36.475954, -81.809950). Scope of work: Demolish broken section of trail and remove debris, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 5 CY of Asphalt - No base needed, 49 FT long x 8 FT wide x 4 IN deep, Replace 1.2 CY of Concrete, 9 FT long x 11 FT wide x 4 IN deep, Replace 2 x 8 Wood railings, 11 FT long, Replace 2 x 11 Wood railings, 11 FT long. The damage was caused by Hurricane Helene.
Posted Date
Sep 10, 2025
Due Date
Nov 18, 2025
Release: Sep 10, 2025
Town of Mountain City
Close: Nov 18, 2025
Restore this facility to its pre-disaster design, function, and capacity within the existing footprint. Involves removal of debris and to repair asphalt, concrete, and wood along this section of Goose Creek Trail (36.475954, -81.809950). Scope of work: Demolish broken section of trail and remove debris, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 196 SF of Chain-link, which is 49 FT long x 4 FT high, Replace 5 CY of Asphalt - No base needed, 49 FT long x 8 FT wide x 4 IN deep, Replace 1.2 CY of Concrete, 9 FT long x 11 FT wide x 4 IN deep, Replace 2 x 8 Wood railings, 11 FT long, Replace 2 x 11 Wood railings, 11 FT long. The damage was caused by Hurricane Helene.
City of Madison
Sauk creek greenway phase 3 & 4.
Posted Date
Oct 14, 2024
Due Date
Dec 18, 2025
Release: Oct 14, 2024
City of Madison
Close: Dec 18, 2025
Sauk creek greenway phase 3 & 4.
AvailablePasco County
Work includes to perform inspections, general maintenance service and repairs to the communication towers located throughout the county on an as-needed basis.
Posted Date
Oct 9, 2025
Due Date
Nov 18, 2025
Release: Oct 9, 2025
Pasco County
Close: Nov 18, 2025
Work includes to perform inspections, general maintenance service and repairs to the communication towers located throughout the county on an as-needed basis.
Town of Wendell
The project includes the following work: construction of a 12-foot wide asphalt greenway.
Posted Date
-
Due Date
Nov 20, 2025
Release: -
Town of Wendell
Close: Nov 20, 2025
The project includes the following work: construction of a 12-foot wide asphalt greenway.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis