Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design, procure, install, and commission a micro-inverter solar system at Kingston Ridge, a multifamily apartment building. This project involves the design, procurement, installation, and commissioning of a grid-tied solar photovoltaic system with an estimated annual energy output of 119,199 kWh and a minimum system size of 117.92 kW DC. The system will utilize microinverter technology to optimize performance and monitoring at the module level.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide design and installation for a solar project at Golden Tides II Apartments. This project involves the design, procurement, installation, and commissioning of a grid-tied solar photovoltaic system with an estimated annual energy output of 119,199 kWh and a minimum system size of 117.92 kW DC. The system will utilize microinverter technology to optimize performance and monitoring at the module level.
Posted Date
Jan 6, 2026
Due Date
Jan 16, 2026
Release: Jan 6, 2026
Close: Jan 16, 2026
Provide design and installation for a solar project at Golden Tides II Apartments. This project involves the design, procurement, installation, and commissioning of a grid-tied solar photovoltaic system with an estimated annual energy output of 119,199 kWh and a minimum system size of 117.92 kW DC. The system will utilize microinverter technology to optimize performance and monitoring at the module level.
AvailableWork includes roofing contractors licensed in the state of maryland for the removal and replacement of existing roof shingles, rotted roof sheathing, roofing underlayment, vent collars and/or attic louvers, drip edges, flashing, fascia and gable end vents, rake boards and ridge vents, downspouts, gutter-guards, gutters, splash guards, splash blocks and related work at ridge apartments. Rotted fascia boards will be removed and replaced as part of the scope of services; Remove all of the existing shingle and flashing membranes down to the bare deck surface; Plywood will be billed at separate specified rate per 4'x 8' piece. See outside link.
Posted Date
Dec 18, 2025
Due Date
Jan 23, 2026
Release: Dec 18, 2025
Close: Jan 23, 2026
Work includes roofing contractors licensed in the state of maryland for the removal and replacement of existing roof shingles, rotted roof sheathing, roofing underlayment, vent collars and/or attic louvers, drip edges, flashing, fascia and gable end vents, rake boards and ridge vents, downspouts, gutter-guards, gutters, splash guards, splash blocks and related work at ridge apartments. Rotted fascia boards will be removed and replaced as part of the scope of services; Remove all of the existing shingle and flashing membranes down to the bare deck surface; Plywood will be billed at separate specified rate per 4'x 8' piece. See outside link.
Design, furnish, and install approx 71kW DC of roof-mounted photovoltaic capacity on the Soundview Apartments. Work will interconnect to the utility side of the customers' meters, and the generation credits will be measured by Cowlitz Public Utility District (PUD) and distributed to the residents as a bill credit.
Posted Date
Jan 6, 2026
Due Date
Feb 9, 2026
Release: Jan 6, 2026
Close: Feb 9, 2026
Design, furnish, and install approx 71kW DC of roof-mounted photovoltaic capacity on the Soundview Apartments. Work will interconnect to the utility side of the customers' meters, and the generation credits will be measured by Cowlitz Public Utility District (PUD) and distributed to the residents as a bill credit.
Provide versajet ii system.
Posted Date
Dec 29, 2025
Due Date
Jan 12, 2026
Release: Dec 29, 2025
Close: Jan 12, 2026
Provide versajet ii system.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis