Retrieving RFP details
Release
Close
Gainesville-Alachua County Regional Airport Authority
Work shall include the installation of electric vehicle charging stations. Work includes furnishing new electrical distribution equipment and establishing a new electrical service in coordination with Gainesville Regional Utilities (GRU). Additional work involves extending the existing fiber optic network to provide communication to the site.
NJ Division of Property Management & Construction
Electric vehicle charging stations.
Orlando Utilities Commission
Electronic vehicle charging network services.
City of Newnan
Purchase, delivery, and installation of three (3) electric vehicle (EV) charging stations. Equipment Specifications. • Charging stations must be new, UL-certified, and compliant with SAE J1772 (Level 2), CCS, and/or CHAdeMO standards (for DC fast charging). • Must support Open Charge Point Protocol (OCPP 1.6 or higher) to ensure network. interoperability. • Networking must allow for usage monitoring, reporting, and remote troubleshooting. • Equipment must meet ADA accessibility requirements. Installation Requirements: • The contractor is responsible for all site preparation, trenching, conduit installation, electrical upgrades, concrete pads, signage, and striping as required. • All work must comply with the National Electrical Code (NEC), local building codes, and permitting requirements. • The contractor must coordinate with the local utility provider for power connection and upgrades if required. • Contractor must ensure ADA-compliant site layout.
Release
Oct 08, 2025
Close
Nov 21, 2025