Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the installation of replacement MCCs in an exterior enclosure, concrete foundations, an underground electrical duct bank system and other related work at the District’s Wastewater Treatment Facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
This project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of replace existing mcc and lighting panelboard and refeed all existing loads from new equipment - replace electrical feeder from the existing main distribution switchboard to the new mcc. - provide new power monitoring system connected to the scada system - provide temporary standby generator to maintain plant operations at all times. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Project consist of replace existing mcc and lighting panelboard and refeed all existing loads from new equipment - replace electrical feeder from the existing main distribution switchboard to the new mcc. - provide new power monitoring system connected to the scada system - provide temporary standby generator to maintain plant operations at all times. See outside link.
AvailableReplacement of roughly 8,500' of cast iron pipe with 6" and 4" PVC pipe and 200' 6" fusible PVC, this scope includes 190 water service reconnections. Surface restoration includes trench asphalt patch paving, roto-milling, overlay and miscellaneous concrete repair.
Posted Date
Jan 9, 2026
Due Date
Feb 4, 2026
Release: Jan 9, 2026
Close: Feb 4, 2026
Replacement of roughly 8,500' of cast iron pipe with 6" and 4" PVC pipe and 200' 6" fusible PVC, this scope includes 190 water service reconnections. Surface restoration includes trench asphalt patch paving, roto-milling, overlay and miscellaneous concrete repair.
AvailableDESIGN BUILD- remove and replace the existing roof on areas 2-6, total roof area is approx., 334,725 SF.
Posted Date
Jan 2, 2026
Due Date
Feb 3, 2026
Release: Jan 2, 2026
Close: Feb 3, 2026
DESIGN BUILD- remove and replace the existing roof on areas 2-6, total roof area is approx., 334,725 SF.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →