Summary
Work for package 1 includes: replace existing 6-inch and 8-inch VCP gravity flow pipe with approx. 2.1 miles of 8" and 1.6 miles of 10" DR-17 IPS HDPE by pipe bursting; replace associated manholes; reconnect services; associated work. Package 2: replace existing 6-inch and 8-inch VCP gravity flow pipe with approx. 3.3 miles of 8" DR-17 IPS HDPE by pipe bursting; replace associated manholes; reconnect services; replace lift station wet well, piping, and pumps, and convert existing wet well to manhole; construct 513 LF of 6" sdr-21 PVC force main; rehabilitate 13 manholes; associated work. See outside link.