Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 940 SF of 4" concrete walk, as per plan; 2,820 SF curb ramp; 50 LF curb, type 6; 20 CY top soil; 50 SY seeding and mulching; 700 SY partial depth pavement repair; 499 SY pavement repair; 30,425 SY of 2 3/7" pavement planning, aslhalt concrete; 4,633 Gal non-tracking tack coat; 1,275 CY asphalt concrete intermediate course; 35 EA manhole adjusted to grade; 40 EA valve box.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for the Doylestown Rd. & Portage St. Resurfacing Project.
Posted Date
Jan 16, 2026
Due Date
Feb 10, 2026
Release: Jan 16, 2026
Close: Feb 10, 2026
Procurement of services for the Doylestown Rd. & Portage St. Resurfacing Project.
AvailableW. Sharon Rd. Resurfacing.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
W. Sharon Rd. Resurfacing.
AvailableRelease: Jan 21, 2026
Close: Mar 4, 2026
Work includes road resurfacing.
AvailableThe improvements under this contract consist of but are not limited to, MOT (standard, traffic control officer, barricade, temporary barrier, signalization maintenance, traffic detection and maintenance), sediment (barrier, inlet protection), guardrail replacement, asphalt (milling, resurfacing, miscellaneous), pavement markings (rumble strips, rpm, painted, thermoplastic, permanent tape), signing (single column, multi-column, tubular marker, overhead cantilever signs), its (electrical, cabinet, pole complete, fiber optic, cameras, network switch, pull/splice box, conduit). See attached file for full scope.
Posted Date
Jan 23, 2026
Due Date
Feb 25, 2026
Release: Jan 23, 2026
Close: Feb 25, 2026
The improvements under this contract consist of but are not limited to, MOT (standard, traffic control officer, barricade, temporary barrier, signalization maintenance, traffic detection and maintenance), sediment (barrier, inlet protection), guardrail replacement, asphalt (milling, resurfacing, miscellaneous), pavement markings (rumble strips, rpm, painted, thermoplastic, permanent tape), signing (single column, multi-column, tubular marker, overhead cantilever signs), its (electrical, cabinet, pole complete, fiber optic, cameras, network switch, pull/splice box, conduit). See attached file for full scope.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis