Summary
Seeking qualified and experienced firms for hurricane damage repairs at the Airport. The project Base Bid includes an in-kind replacement of all airfield electrical lighting fixtures,signage, the electrical vault building and all associated electrical components. The Base Bid also includes an elevate steel platform that mounts the vault 16' above ground level. The Bid Alternate includes all the same items as the Base Bid except for the vault platform and appurtenances. Base Bid Additive 1 includes the repair of the existing articulating concrete mat erosion control structures located on the Runway 5 end within the area noted on the plans.