Summary
Provide preventative maintenance and repairs for the standby emergency generators and automatic transfer switches. The typical maintenance schedule for maintenance and repairs for emergency generators and automatic transfer switches is provided below. The required maintenance will include a semi-annual and annual comprehensive service and performance inspection including an annual 4-hour load bank test. This contract will also include all parts and materials necessary to complete the assigned tasks including but not limited to oil, coolant, batteries, hoses, fittings, gauges, oil filters, air filters, fuel filters, indicator lamps and any electrical wiring and components. The semi-annual inspection and service must be completed by December 31st. The annual inspection and service must be complete by June 30th.