Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply and install a new standby generator system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Supply and installation of a new standby diesal generator system. This project includes retiring the existing generator in place, replacing the existing automatic transfer switch, and installing a new generator on a poured concrete pad located in the designated alcove near the radio tower.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Supply and installation of a new standby diesal generator system. This project includes retiring the existing generator in place, replacing the existing automatic transfer switch, and installing a new generator on a poured concrete pad located in the designated alcove near the radio tower.
Premium
Access the largest public sector contact database
Procurement of a 150KW, 460V, tank-mounted, stationary diesel generator with manual transfer switch and camlock connections, including complete installation services.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Procurement of a 150KW, 460V, tank-mounted, stationary diesel generator with manual transfer switch and camlock connections, including complete installation services.
Furnish and install a 40kW natural gas standby generator with an automatic transfer switch (ATS) at its facility.
Posted Date
Dec 7, 2025
Due Date
Jan 23, 2026
Release: Dec 7, 2025
Close: Jan 23, 2026
Furnish and install a 40kW natural gas standby generator with an automatic transfer switch (ATS) at its facility.
AvailableProvide the installation of backup building generator.
Posted Date
Dec 8, 2025
Due Date
Jan 26, 2026
Release: Dec 8, 2025
Close: Jan 26, 2026
Provide the installation of backup building generator.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis