Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform generator repairs, maintenance and preventative maintenance service for all properties within 360 Management Groups portfolio.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of the emergency generator serving the Monico Emergency Management tower site.
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of the emergency generator serving the Monico Emergency Management tower site.
AvailablePremium
Access the largest public sector contact database
Optional Emergency Stand-by Generator Replacement.
Posted Date
Dec 12, 2025
Due Date
Jan 21, 2026
Release: Dec 12, 2025
Close: Jan 21, 2026
Optional Emergency Stand-by Generator Replacement.
AvailableWork consists of: replacing the existing 250 kilowatt exterior generator serving rita tallent picken regional center for the arts and humanities on the uw-parkside campus. The existing generator and associated accessories, components, conductors, etc. Shall be demolished and replaced with new, as described within the project documents. The new generator is sized and rated to match the existing genset specification. Existing conduit paths, raceway, pull and junction boxes shall be salvaged and protected for the installation of new conductors between the new generator and existing downstream distribution equipment.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Work consists of: replacing the existing 250 kilowatt exterior generator serving rita tallent picken regional center for the arts and humanities on the uw-parkside campus. The existing generator and associated accessories, components, conductors, etc. Shall be demolished and replaced with new, as described within the project documents. The new generator is sized and rated to match the existing genset specification. Existing conduit paths, raceway, pull and junction boxes shall be salvaged and protected for the installation of new conductors between the new generator and existing downstream distribution equipment.
AvailableScope is to furnish all required supervision, labor, materials, transportation, equipment, chemicals, and tools necessary to perform emergency repair maintenance on all generator sets. The generator sets under this contract range from 18kw to 1000kw and include engines manufactured by cummins and onan. The cost of any emergency repair will be on a time-and-materials basis.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
Scope is to furnish all required supervision, labor, materials, transportation, equipment, chemicals, and tools necessary to perform emergency repair maintenance on all generator sets. The generator sets under this contract range from 18kw to 1000kw and include engines manufactured by cummins and onan. The cost of any emergency repair will be on a time-and-materials basis.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis