Summary
Contractor will be performing water utility and road work. Water utility work will include installing pipe following the existing alignment and rerouting at particular areas to run within the roadbed. Supporting work to include replacement of infrastructure in existing valve boxes, fire boxes, and stand pipes, construction of a new valve box, rehabilitation of three existing tanks, and replacing appurtenances at four well locations. Road work will include pulverization and paving of existing roads. The Contractor will be responsible to maintain water service to buildings at the Visitor Center and fire station areas and tie into existing campground loops.