Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The major items of work to be performed under this contract include, but are not limited to, the following: Provide all temporary traffic control in accordance with a Contractor-prepared, MDDOT approved, temporary traffic control plan. Replace 8 pot bearings; Temporary jacking of bridge; Replace elastomeric bearings; Spall and Crack repairs The Contractor will need to completely close the bridge in one direction for each bearing replacement. There are 4 total bearing replacements associated with this contract (2 Northbound, 2 Southbound). A full bridge closure for each direction will be permissible starting on Friday Night and extending through Sunday. Contractor will be responsible for all traffic control measures associated with the closures.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project consists of structural repairs to Abutment B and bearing rehabilitation for Trusses C and D of the Purple People Bridge. Work includes, but is not limited to, temporary support and jacking operations, selective removal of deteriorated material, reinforced concrete bearing reconstruction, installation of steel components, and related restoration work.
Posted Date
Jan 6, 2026
Due Date
Feb 6, 2026
Release: Jan 6, 2026
Close: Feb 6, 2026
The project consists of structural repairs to Abutment B and bearing rehabilitation for Trusses C and D of the Purple People Bridge. Work includes, but is not limited to, temporary support and jacking operations, selective removal of deteriorated material, reinforced concrete bearing reconstruction, installation of steel components, and related restoration work.
AvailableWTP Clarifier Bearing Replacement.
Posted Date
Jan 17, 2026
Due Date
Feb 6, 2026
Release: Jan 17, 2026
Close: Feb 6, 2026
WTP Clarifier Bearing Replacement.
AvailableTDOT solicits CM/GC preconstruction services (with option to negotiate construction under a GMP) for the SR-1 Bridge Replacement over the North Fork Holston River (Hawkins & Sullivan Counties, TN). Key commercial points: preconstruction services estimate not to exceed $450,000; estimated construction cost ~$50,000,000; CM/GC must self-perform at least 30% of construction; surety letter showing bonding capacity ≥ $50,000,000 required; minimum insurance and TDOT prequalification required; mandatory pre-proposal meeting (failure to attend results in elimination); environmental clearance pending and construction proceeds only after GMP acceptance. Organizational conflict restrictions list several firms that cannot participate on proposer teams.
Posted Date
Dec 4, 2025
Due Date
Feb 6, 2026
Release: Dec 4, 2025
Close: Feb 6, 2026
TDOT solicits CM/GC preconstruction services (with option to negotiate construction under a GMP) for the SR-1 Bridge Replacement over the North Fork Holston River (Hawkins & Sullivan Counties, TN). Key commercial points: preconstruction services estimate not to exceed $450,000; estimated construction cost ~$50,000,000; CM/GC must self-perform at least 30% of construction; surety letter showing bonding capacity ≥ $50,000,000 required; minimum insurance and TDOT prequalification required; mandatory pre-proposal meeting (failure to attend results in elimination); environmental clearance pending and construction proceeds only after GMP acceptance. Organizational conflict restrictions list several firms that cannot participate on proposer teams.
This RFP is for the replacement of existing low-level bridges and construction of new bridges on SR 5 (US 1) over Pellicer Creek, including flexible pavement reconstruction, milling and resurfacing, base work, shoulder gutter, guardrail, soil stabilization, and signing/pavement markings.
Posted Date
Jan 28, 2026
Due Date
Jan 28, 2026
Release: Jan 28, 2026
Close: Jan 28, 2026
This RFP is for the replacement of existing low-level bridges and construction of new bridges on SR 5 (US 1) over Pellicer Creek, including flexible pavement reconstruction, milling and resurfacing, base work, shoulder gutter, guardrail, soil stabilization, and signing/pavement markings.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis