Summary
Work includes approx 1,832 LF of 6" C900 PVC Water Main; 54 meters new service lines by open cut and trenchless applications; 4,185 LF of 8" gravity main through open cut and trenchless applications; pre & post CCTV camera inspection, new hydrants, gate valves and additional fittings, testing, abandonment of existing gravity mains, the installation of 58 new cleanouts, and all other equipment, labor, materials, milling and replacement of asphalt in the roads and allies, removing and replacing alley driveway aprons, raising and lower valves/manholes/catch basins, and installing new signage and striping, mobilization & demobilization, traffic control, erosion control, pressure testing, and stump removal.