Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Litchfield
Three (3) 15/20/25 MVA at 55°C, 16.8/22.4/28 MVA at 65°C, ONAN/ONAF/ ONAF, 115 Y/66.4 kV to 12.47 GRDY/7.2 kV with LTC and accessories.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Alexandria Light and Power Utilities
Base Bid: One (1) 12/22.4 MVA at 55/65°C, ONAN/ONAFAF, 115 kV Delta to 13.2 GRDY/7.62 kV with LTC and accessories
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Alexandria Light and Power Utilities
Close: Dec 9, 2025
Base Bid: One (1) 12/22.4 MVA at 55/65°C, ONAN/ONAFAF, 115 kV Delta to 13.2 GRDY/7.62 kV with LTC and accessories
AvailableCity of Sioux Center
Furnishing and installing a new lineup of 15 kV indoor metalclad switchgear including eight (8) vacuum circuit breakers with related controls and accessories.
Posted Date
Nov 11, 2025
Due Date
Dec 16, 2025
Release: Nov 11, 2025
City of Sioux Center
Close: Dec 16, 2025
Furnishing and installing a new lineup of 15 kV indoor metalclad switchgear including eight (8) vacuum circuit breakers with related controls and accessories.
AvailableCity of Lehi
Lehi City Power seeks a supplier to design, fabricate, inspect, test, deliver, dress, and fill two three-phase power transformers for the Carter Substation in Lehi, Utah. The transformers are to be 138-12.47kV with a 13.2kV nominal low voltage.
Posted Date
-
Due Date
Dec 11, 2025
City of Lehi
Close: Dec 11, 2025
Lehi City Power seeks a supplier to design, fabricate, inspect, test, deliver, dress, and fill two three-phase power transformers for the Carter Substation in Lehi, Utah. The transformers are to be 138-12.47kV with a 13.2kV nominal low voltage.
AvailableIdaho Operations Office
Performing large-scale shake table testing of a fully dressed 230 kV power transformer.
Posted Date
May 27, 2025
Due Date
Jun 1, 2026
Release: May 27, 2025
Idaho Operations Office
Close: Jun 1, 2026
Performing large-scale shake table testing of a fully dressed 230 kV power transformer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis