Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge Replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
Posted Date
Oct 23, 2023
Due Date
Jul 1, 2026
Release: Oct 23, 2023
Close: Jul 1, 2026
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 24, 2025
Close: Jan 20, 2026
Bridge replacement.
AvailableThe City of Gallatin is seeking to retain professional engineering consulting firms to design and prepare final construction plans for the South Westland Avenue (Bridge 833328 over CSX) replacement project, including preliminary engineering, environmental investigations, public involvement, surveying, right-of-way acquisition, utility/rail coordination, and preparation of bid documents. The project will replace the existing bridge with a new two-lane bridge with sidewalks, realign approaches, improve drainage, and relocate utilities.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The City of Gallatin is seeking to retain professional engineering consulting firms to design and prepare final construction plans for the South Westland Avenue (Bridge 833328 over CSX) replacement project, including preliminary engineering, environmental investigations, public involvement, surveying, right-of-way acquisition, utility/rail coordination, and preparation of bid documents. The project will replace the existing bridge with a new two-lane bridge with sidewalks, realign approaches, improve drainage, and relocate utilities.
AvailableReplacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →