Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide bridge replacement. Work includes 1 LS clearing and grubbing; 92 CY of excavation; 22 SF of full depth pavement sawing; 26 CY of aggregate base; 11 LB type 1 crack sealing; 4 CY of asphalt concrete surface; 205 SY of seeding and mulching. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design, purchasing, delivering and installing a 40' span prefabricated steel truss trail bridge and 2 rock gabions.
Posted Date
Dec 19, 2025
Due Date
Jan 30, 2026
Release: Dec 19, 2025
Close: Jan 30, 2026
Design, purchasing, delivering and installing a 40' span prefabricated steel truss trail bridge and 2 rock gabions.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work shall consist essentially of the following items: replacement of trail bridge decking and railing and repairs to failed substructure elements as directed.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
The work shall consist essentially of the following items: replacement of trail bridge decking and railing and repairs to failed substructure elements as directed.
AvailableDes Moines Water Works is soliciting proposals from licensed engineering consulting firms to provide design services for replacement of the existing Bill Riley Trail pedestrian bridge over the Raccoon River in Water Works Park. The scope includes conceptual design evaluation, permitting, full design, and preparation of plans and specifications. The project is estimated in the $500,000–$2,000,000 range (aggregator estimate) and is funded/managed by Des Moines Water Works (with local funding/foundations and potential STBG grant involvement referenced in municipal documents).
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Des Moines Water Works is soliciting proposals from licensed engineering consulting firms to provide design services for replacement of the existing Bill Riley Trail pedestrian bridge over the Raccoon River in Water Works Park. The scope includes conceptual design evaluation, permitting, full design, and preparation of plans and specifications. The project is estimated in the $500,000–$2,000,000 range (aggregator estimate) and is funded/managed by Des Moines Water Works (with local funding/foundations and potential STBG grant involvement referenced in municipal documents).
AvailableThis solicitation requests design, procurement, delivery, and installation of a 40-foot span prefabricated steel truss trail bridge and two rock gabions to replace the Kinney Creek Trail bridge in a remote site requiring helicopter transport. The contract is set aside for Small Business under NAICS 237310 and is likely a fixed-price construction procurement with an estimated value range of $250,000–$500,000. Questions were due January 19, 2026 and quotes are due January 30, 2026 (NLT 17:00 Mountain Time); amendments and Q&A documents were posted on January 16, 2026.
Posted Date
Dec 19, 2025
Due Date
Jan 31, 2026
Release: Dec 19, 2025
Close: Jan 31, 2026
This solicitation requests design, procurement, delivery, and installation of a 40-foot span prefabricated steel truss trail bridge and two rock gabions to replace the Kinney Creek Trail bridge in a remote site requiring helicopter transport. The contract is set aside for Small Business under NAICS 237310 and is likely a fixed-price construction procurement with an estimated value range of $250,000–$500,000. Questions were due January 19, 2026 and quotes are due January 30, 2026 (NLT 17:00 Mountain Time); amendments and Q&A documents were posted on January 16, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →