Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace Mechanical and Boiler Room exterior doors and windows. Construct opening for new coiling door. Replace all windows at each floor level. Construct wall below each window to flush with existing CME wall. Provide full width architectural louver for a/c unit.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project includes the following Work: Removal and replacement of windows in various apartment units.
Posted Date
Dec 17, 2025
Due Date
Feb 5, 2026
Release: Dec 17, 2025
Close: Feb 5, 2026
The Project includes the following Work: Removal and replacement of windows in various apartment units.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Window blinds to be removed, stored, cleaned and rehung; Relocate furniture and other furnishings as required to facilitate removal and installation of new windows; Protect furnishings, flooring from debris or other related construction processes; Protect exterior shrubbery, plants and turf from debris and other construction related processes; Remove all caulking residue from exterior; Repair replace as needed, interior drywall, texture and paint; Install new replacement window, attaching to existing structure members. Window to be centered with existing opening as well as the header and sill such that window is promotionally set. Where double windows are installed, both windows are to be set such that all horizontal features are exact; Insulate all four sides of each window with batt insulation and/or expanding foam, ensuring that all cavities are completely filled. The contractor shall ensure the operable windows are easily opened and closed after insulation has been installed and prior to installation of interior trim. Window installations to be inspected by university prior to installation of interior trim. Caulk all joints of frames, and windows. Prep and paint existing interior to match existing at perimeter; Prep and paint interior drywall returns on all side; at the exterior, remove and replace cracked caulking at the juncture of window to brick, window to sill points; caulk joints of new windows; Final clean windows at interior and exterior; relocate furniture/furnishes; Perform quality assurance inspections, prior to university final inspection; The contractor responsible for all measurements required for accurate material quantities and precision installation of windows and associated trim. ADD ALTERNATE NO. 1 Installation of new faux wood, cordless blinds.
Posted Date
Jan 17, 2026
Due Date
Feb 18, 2026
Release: Jan 17, 2026
Close: Feb 18, 2026
Window blinds to be removed, stored, cleaned and rehung; Relocate furniture and other furnishings as required to facilitate removal and installation of new windows; Protect furnishings, flooring from debris or other related construction processes; Protect exterior shrubbery, plants and turf from debris and other construction related processes; Remove all caulking residue from exterior; Repair replace as needed, interior drywall, texture and paint; Install new replacement window, attaching to existing structure members. Window to be centered with existing opening as well as the header and sill such that window is promotionally set. Where double windows are installed, both windows are to be set such that all horizontal features are exact; Insulate all four sides of each window with batt insulation and/or expanding foam, ensuring that all cavities are completely filled. The contractor shall ensure the operable windows are easily opened and closed after insulation has been installed and prior to installation of interior trim. Window installations to be inspected by university prior to installation of interior trim. Caulk all joints of frames, and windows. Prep and paint existing interior to match existing at perimeter; Prep and paint interior drywall returns on all side; at the exterior, remove and replace cracked caulking at the juncture of window to brick, window to sill points; caulk joints of new windows; Final clean windows at interior and exterior; relocate furniture/furnishes; Perform quality assurance inspections, prior to university final inspection; The contractor responsible for all measurements required for accurate material quantities and precision installation of windows and associated trim. ADD ALTERNATE NO. 1 Installation of new faux wood, cordless blinds.
AvailableWork includes Removal and replace windows in existing masonry openings in 74 units in 3 residential buildings. Replace composite masonry sills and exterior trim. Selective replacement of interior trim. Painting of trim. Furnish and install through-window air source heat pumps (148 total). Provide new power outlets & surface raceway for heat pumps. Asbestos remediation of sills and windows.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes Removal and replace windows in existing masonry openings in 74 units in 3 residential buildings. Replace composite masonry sills and exterior trim. Selective replacement of interior trim. Painting of trim. Furnish and install through-window air source heat pumps (148 total). Provide new power outlets & surface raceway for heat pumps. Asbestos remediation of sills and windows.
AvailableThe Housing Authority of the City of England, Arkansas is soliciting sealed bids to replace HVAC systems in all specified dwelling units, which will remain occupied during the work. A pre‑bid conference and walkthrough is scheduled for February 3, 2026 at 2:00 PM at 102 Benafield Street, England, AR. Bids are due by 1:00 PM CST on February 17, 2026, with documents available via the Memphis Reprographics online planroom.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
The Housing Authority of the City of England, Arkansas is soliciting sealed bids to replace HVAC systems in all specified dwelling units, which will remain occupied during the work. A pre‑bid conference and walkthrough is scheduled for February 3, 2026 at 2:00 PM at 102 Benafield Street, England, AR. Bids are due by 1:00 PM CST on February 17, 2026, with documents available via the Memphis Reprographics online planroom.