Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals to meet all capacity and energy requirements associated with its retail load beginning June 1, 2029. This RFP invites comprehensive proposals that address FPB’s current and future energy needs, with opportunities for respondents to submit responses to either the primary proposal requests and/or the alternative proposal requests for consideration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking professional services from one or more qualified firms to provide on as of need basis engineering services, including civil, structural, mechanical, electrical, instrumentation, and chemical services to support the plant engineering section to ensure reliable operation of power generating units.
Posted Date
Nov 12, 2025
Due Date
Dec 15, 2025
Release: Nov 12, 2025
Close: Dec 15, 2025
Seeking professional services from one or more qualified firms to provide on as of need basis engineering services, including civil, structural, mechanical, electrical, instrumentation, and chemical services to support the plant engineering section to ensure reliable operation of power generating units.
Premium
Access the largest public sector contact database
Provide uninterrupted power supply services.
Posted Date
Nov 15, 2025
Due Date
Dec 17, 2025
Release: Nov 15, 2025
Close: Dec 17, 2025
Provide uninterrupted power supply services.
AvailableProject includes local service providers for erate-category 2 - uninterrupted power supply.
Posted Date
Nov 5, 2025
Due Date
Dec 15, 2025
Release: Nov 5, 2025
Close: Dec 15, 2025
Project includes local service providers for erate-category 2 - uninterrupted power supply.
AvailableProvide enterprise-grade, e-rate eligible UPS (uninterruptible power supply) equipment to be used throughout the district's 22 schools and designated support facilities. Includes, 103007018-5591 Eaton 2-Post Rack-Mount Installation Kit for Select 2U 5PX G2 and Tripp Lite Series SmartPro UPS Systems 17; 744-A3121 UPS Replacement Battery Cartridge Kit for Eaton BP72VRM2U External (Order 2 Per Unit) 30; 744-A4852 UPS Replacement Battery Cartridge Kit for Tripplite Smart2200RMXL2U (Order 1 Per Unit) 43; BP72VRM2U Tripp Lite series 72V Extended Battery Module (EBM) for 1950VA SmartPro UPS Systems, 2U Rack/Tower 15; RBC12V-1U UPS Replacement Battery Cartridge Kit for Tippelite SMART1500RT1UN 9; RBC54 UPS Replacement Battery Cartridge Kit for Tripplite Smart2200RMXL2U (Order 1 Per Unit) 8; RBC94-2U UPS Replacement Battery Cartridge Kit for Tripplite Smart2200RMXL2U (Order 1 Per Unit) 16.
Posted Date
Nov 21, 2025
Due Date
Jan 6, 2026
Release: Nov 21, 2025
Close: Jan 6, 2026
Provide enterprise-grade, e-rate eligible UPS (uninterruptible power supply) equipment to be used throughout the district's 22 schools and designated support facilities. Includes, 103007018-5591 Eaton 2-Post Rack-Mount Installation Kit for Select 2U 5PX G2 and Tripp Lite Series SmartPro UPS Systems 17; 744-A3121 UPS Replacement Battery Cartridge Kit for Eaton BP72VRM2U External (Order 2 Per Unit) 30; 744-A4852 UPS Replacement Battery Cartridge Kit for Tripplite Smart2200RMXL2U (Order 1 Per Unit) 43; BP72VRM2U Tripp Lite series 72V Extended Battery Module (EBM) for 1950VA SmartPro UPS Systems, 2U Rack/Tower 15; RBC12V-1U UPS Replacement Battery Cartridge Kit for Tippelite SMART1500RT1UN 9; RBC54 UPS Replacement Battery Cartridge Kit for Tripplite Smart2200RMXL2U (Order 1 Per Unit) 8; RBC94-2U UPS Replacement Battery Cartridge Kit for Tripplite Smart2200RMXL2U (Order 1 Per Unit) 16.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis