Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Ohio Department of Natural Resources seeks a licensed general contractor to perform floor reconfiguration and renovations on the third floor of Building E, including installation of new doors and hard walls, demolition of existing masonry dividing walls, new electrical/data lines, countertops/cabinets, and painting. The contractor will be responsible for daily cleanup, disposal of scrap, coordination of handover of owner-owned equipment, and procuring required permits through the Ohio Department of Commerce. The project is expected to be completed by September 30, 2026 and BidBanana lists an AI budget estimate of $400,000–$600,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Piedmont Technical College is soliciting bids for the E-Building Renovations project to renovate approximately 5,400 gross square feet of office space including office HVAC and restrooms and restroom HVAC. The project is estimated between $900,000 and $1,021,840 and will be delivered using the Design-Bid-Build method. Bids are due January 7, 2026 at 2:00 PM (buyer local time — South Carolina, Eastern Time).
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Piedmont Technical College is soliciting bids for the E-Building Renovations project to renovate approximately 5,400 gross square feet of office space including office HVAC and restrooms and restroom HVAC. The project is estimated between $900,000 and $1,021,840 and will be delivered using the Design-Bid-Build method. Bids are due January 7, 2026 at 2:00 PM (buyer local time — South Carolina, Eastern Time).
AvailableProject consists of renovations to the existing second floor space at the educational service center.
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
Project consists of renovations to the existing second floor space at the educational service center.
AvailableWork consists of the renovations of building of approximately 16,000 square feet. The renovation will include interior and exterior finish up- grades.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Work consists of the renovations of building of approximately 16,000 square feet. The renovation will include interior and exterior finish up- grades.
AvailableDemolition of existing office and records space on the third floor of the new administration building and the build -out of new offices, conference rooms, and other spaces to support the glwa design, construction, and engineering groups; removal and replacement of an existing air handling unit that serves the third-floor space; associated demolition and new construction for the temporary process control center space on the first floor; and the sequenced demolition and new construction at the existing third and fourth floor main toilet rooms.
Posted Date
Sep 8, 2025
Due Date
Dec 19, 2025
Release: Sep 8, 2025
Close: Dec 19, 2025
Demolition of existing office and records space on the third floor of the new administration building and the build -out of new offices, conference rooms, and other spaces to support the glwa design, construction, and engineering groups; removal and replacement of an existing air handling unit that serves the third-floor space; associated demolition and new construction for the temporary process control center space on the first floor; and the sequenced demolition and new construction at the existing third and fourth floor main toilet rooms.