Retrieving RFP details
Release
Close
Fountain County
The proposed construction will include existing bridge superstructure removal, installation of new steel i-beam superstructure, new reinforced concrete approach slabs, and guardrail. Additional work consists of conversion to semi-integral end bents, installation of new reinforced concrete approach slabs, and guardrail; and all incidental work required, as specified in the contract document and plans. Construction engineering; mobilization and demobilization; clearing right-of-way; present structure, remove portions, structure no; 24 CY excavation, common; 425 CY borrow; 4 CY sediment, remove; 910 LF filter sock; 861 SY manufactured surface protection product; 1 EA mobilization and demobilization for surface stabilization; 20 CY excavation, foundation, unclassified. See attached file.
County of Bucks
Superstructure replacement of bucks county bridge no. 258.
Township of Washington
Bridge superstructure replacement.
Town of Windham
Replacement of the existing bridge with a steel superstructure, concrete deck with integral wearing surface, concrete abutments, replacing existing guardrails, approach work, and other incidental work.
Release
Oct 21, 2025
Close
Nov 17, 2025